Developed & produced in Switzerland

EMU Professional II: MID-compliant three-phase power meter

The EMU Professional II measures three-phase: the 3/100 version directly up to 100 A, the 3/5 transformer-connected version much higher currents via current transformers. It stores the load profile in the device. Its values are MID-compliant and therefore approved for internal and external billing. The meter mounts on a standard DIN rail.

powered by swiss made software
EMU Professional II three-phase power meter with LC display, CE and M22 marking and the note Made in Switzerland
EMU Professional II 3/100 LoRa · 3×230/400 V · 50 Hz · Cl. B

Certifications

Which certifications does the EMU Professional II hold?


A meter meant for billing has to do more than measure. The EMU Professional II carries the approvals required in Switzerland and in the EU for billing, third-party quantity allocation and energy management.

105,000

entries in the load profile memory

3 years

of history in the device

4

tariffs for consumption and delivery

MID module BType examination, basis for billing active energy in the EU
MID module DProduction monitoring for active energy
METAS IEC 62053-23Type examination certificate for reactive energy (CH-CH003-20029-03)
METAS Module DProduction monitoring for reactive energy (6030-01233)
PTB-A 20.1 and PTB-A 50.7Compliant with verification law, for third-party quantity allocation and energy management
ISO 50001Suitable for energy management systems
CLC/TR 50579Accurate with photovoltaics too

Interfaces

Which interfaces does the EMU Professional II have?


The EMU Professional II is available with different interfaces. The interface determines how it is wired, how often it can be read and which systems receive the readings. Each interface has its own page covering how it works, how to size it and how it works with the EMU M-Center.

As a rule of thumb: M-Bus when many meters for electricity, water and heat come together in one building. RS-485 when the control system and automation already use Modbus. TCP/IP when a network is available and the data is headed for the cloud or a dashboard. LoRa when no cable can be laid.

M-BusTwo wires, polarity-independent, up to 250 meters on the M-Center RS-485 / Modbus RTUFieldbus for control systems, register access TCP/IPModbus TCP and MQTT directly on the network LoRaRadio in the EU868 band, TTN template included KNXFrom Q1 2027

The most common mistake

The interface is often chosen based on what the electrician knows, not on where the data needs to go later. If billing or a dashboard is added two years down the line, the decision is already locked in. That is why we would rather settle the target system than the terminal assignment at the start of a project.

Versions

Which versions of the EMU Professional II are available?


Two decisions determine the version: does the current flow directly through the meter or via transformers, and which interface do the values use to leave the device? The designation on the front panel records both.

Direct connection 3/100 – up to 100 A per phase

Measuring range 0.25–5(100) A · −25 to +70 °C · class B for active energy, class 2 for reactive energy

Transformer connection 3/5 – through current transformers

Measuring range 0.01–1(6) A secondary · −25 to +70 °C · matching current transformers

Further views

EMU Professional II 3/100 LoRa at an angle, ventilation slots and SMA antenna connector visible on the top
Top with antenna connector. On the LoRa versions with a connector for an external antenna, the SMA connector sits on top. Space has to be left above the device in the distribution board, otherwise the antenna cannot be fitted.
EMU Professional II 3/5 TCP/IP at an angle, RJ45 socket visible on the top
Network socket on top. On the TCP/IP versions the RJ45 socket is on the top, in the middle above the cover for the terminal block.

Order numbers

VersionInterfaceArticle numberShop
EMU Professional II 3/100 – direct connection up to 100 Ano interfaceP20A0000Shop: EMU Professional II 3/100 P20A0000 →
EMU Professional II 3/100 M-Bus – direct connection up to 100 AM-BusP20A000MShop: EMU Professional II 3/100 M-Bus P20A000M →
EMU Professional II 3/100 RS485 – direct connection up to 100 AModbus RTU (RS-485)P20A000MOShop: EMU Professional II 3/100 RS485 P20A000MO →
EMU Professional II 3/100 TCP/IP – direct connection up to 100 ATCP/IPP20A000TShop: EMU Professional II 3/100 TCP/IP P20A000T →
EMU Professional II 3/100 LoRa – direct connection up to 100 ALoRa, internal antennaP20A000LOShop: EMU Professional II 3/100 LoRa P20A000LO →
EMU Professional II 3/100 LoRa ext. antenna – direct connection up to 100 ALoRa, internal antenna and SMA connector for external antennaP20A000LEShop: EMU Professional II 3/100 LoRa ext. Antenne P20A000LE →
EMU Professional II 3/100 KNX – direct connection up to 100 AKNX (from Q1 2027)P20A000K
EMU Professional II 3/5 – transformer connectionno interfaceP21A0000Shop: EMU Professional II 3/5 P21A0000 →
EMU Professional II 3/5 M-Bus – transformer connectionM-BusP21A000MShop: EMU Professional II 3/5 M-Bus P21A000M →
EMU Professional II 3/5 RS485 – transformer connectionModbus RTU (RS-485)P21A000MOShop: EMU Professional II 3/5 RS485 P21A000MO →
EMU Professional II 3/5 TCP/IP – transformer connectionTCP/IPP21A000TShop: EMU Professional II 3/5 TCP/IP P21A000T →
EMU Professional II 3/5 LoRa – transformer connectionLoRa, internal antennaP21A000LOShop: EMU Professional II 3/5 LoRa P21A000LO →
EMU Professional II 3/5 LoRa ext. antenna – transformer connectionLoRa, internal antenna and SMA connector for external antennaP21A000LEShop: EMU Professional II 3/5 LoRa ext. Antenne P21A000LE →
EMU Professional II 3/5 KNX – transformer connectionKNX (from Q1 2027)P21A000K

Order online in the EMU Metering shop.

The photos show sample devices. The part number and data sheet are definitive for your order – data sheet and manuals are available for download further down.

Benefits

What does the EMU Professional II do?


Make costs visible

Assign consumption unambiguously to machines, installations, tenants or parts of a building – instead of estimating it with an allocation key.

Identify load peaks

The load profile shows when the peaks occur and where demand charges can be cut – stored in the device, even without a control system.

Use energy efficiently

Continuously recorded, traceable readings as the basis for energy management to ISO 50001.

Simplify billing

MID-compliant data for internal and external billing, including third-party quantity allocation.

Flexible tariff models

Up to four tariffs for consumption and delivery – including for self-consumption associations and tenant electricity.

Straight onto the network

The TCP/IP version sends its values via MQTT to dashboards and cloud services.

Load profile memory

What is the load profile memory in a power meter for?


Most meters show a meter reading. That answers “how much”, but never “when”. Yet demand charges depend on exactly that: two businesses with the same annual consumption can pay very different amounts, depending on whether their consumption is spread evenly or concentrated in a few quarter-hours.

That is why the EMU Professional II stores around 105,000 load profile entries internally, each with 8 energy values and 21 instantaneous values – up to three years of history. The key point: even without a control system. The meter does not depend on anyone polling it regularly. If reading fails for two weeks – network changes, a faulty gateway, holidays – no values are lost; they are simply read out at the next opportunity.

This also changes how a project can be sequenced. You can install meters and start measuring before any energy management system exists. When Joulio-Web or a control system is added later, a year of history is already there instead of starting from zero.

Four tariffs, two directions

Up to four tariffs for consumption and delivery separate peak and off-peak rates as well as energy fed in and energy drawn. In self-consumption associations and tenant electricity schemes, this is what ensures each party is billed for exactly what it drew or delivered.

What the load profile answers

  • When do the demand peaks arise – and what causes them?
  • Is something running at night that nobody ordered?
  • What did the new installation actually achieve?
  • Which tenant, which machine, which area?
  • Is the supplier’s invoice right?

A practical side effect

In the event of a complaint, the disputed period can be reconstructed afterwards instead of estimated. That is the difference between a discussion and an analysis.

Areas of use

Where is the EMU Professional II used?


Production

Consumption per machine or line, as a basis for efficiency projects and ISO 50001 / ISO 14001.

Offices and administration

Consumption per rental unit or part of a building.

Charging infrastructure

Billable measurement at charging points.

PV installations

Accurate to CLC/TR 50579, with tariffs for consumption and delivery.

Tenant electricity | ZEV

Clean allocation in self-consumption associations (ZEV) and tenant electricity schemes.

Municipal utilities

Submetering in existing buildings, including mixed meter estates.

Frequently asked questions

Frequently asked questions about the EMU Professional II


Direct connection or transformers, verification period, tenant electricity, ZEV and LEG, interfaces: all answers can also be found in the meter’s data sheet and manuals, and for ZEV and LEG in Swiss legislation. Here are the most frequent questions.

Approval, accuracy and verification Direct connection Transformer connection Installation, housing and environment Load profile and data storage Interfaces Tenant electricity, ZEV and LEG

Approval, accuracy and verification

What is the EMU Professional II?

The EMU Professional II is a three-phase power meter for the 35 mm DIN rail. It measures active and reactive energy in both directions, stores the load profile in the device, handles up to four tariffs and outputs the values over M-Bus, Modbus RTU, TCP/IP or LoRa depending on the version. It is also referred to as a three-phase energy meter, kWh meter or DIN rail meter.

What accuracy class does the meter have?

Class B to EN 50470-3 for active energy, which corresponds to a maximum deviation of one percent. Class 2 to EN 62053 applies to the reactive energy readings, that is a maximum of two percent. Both classes apply across the whole measuring range and not only at the nominal point.

Is the EMU Professional II approved for billing?

Yes. For active energy, the meter has the MID type examination (module B) and MID production monitoring (module D). It is compliant with verification law to PTB-A 20.1 and in the load profile versions additionally certified to PTB-A 50.7 for third-party quantity allocation and energy management. For reactive energy, it holds a METAS type examination certificate to IEC 62053-23 (CH-CH003-20029-03) and METAS production monitoring to module D (6030-01233), so it is also approved for billing reactive energy.

How long is an electricity meter verified for in Switzerland?

Under Article 6 of the FDJP Ordinance on Measuring Instruments for Electrical Energy and Power (EMmV, SR 941.251), electronic active energy meters must be re-verified every ten years by an authorised verification body. Meters with an electromechanical measuring element have a period of fifteen years.

Can the verification period be extended?

Yes. For directly measuring active energy meters without upstream transformers, Article 6 paragraph 2 EMmV permits a statistical sampling procedure under Annex 4. If a lot passes the sample, all meters in the lot keep their verification validity for a further five years.

Who is responsible for observing the verification period?

Responsibility lies with the person using the measuring instrument, which usually means the owner or operator of the installation. This also applies to sub-meters in a self-consumption association, not only to the distribution grid operator’s meters.

Does the meter also measure correctly downstream of a photovoltaic inverter?

Yes. The EMU Professional II meets CLC/FprTR 50579 and measures correctly even with harmonics in the 2 to 150 kilohertz range of the kind inverters produce. It counts consumption and delivery separately, which is required for self-consumption installations.

Where is the EMU Professional II manufactured?

In Switzerland. Development, PCB assembly, final assembly and testing all take place here, and technical support comes from Baar in the canton of Zug.

Direct connection

What does direct connection mean on an electricity meter?

With a direct connection the entire load current flows through the meter. No current transformers and no conversion are needed. That simplifies installation but limits the measurable current to what the device’s terminals can take.

Up to what current may I measure directly?

The 3/100 direct connection variant measures up to 100 A per phase. Above that a transformer connection is required. For installations close to 100 A the transformer connection is the more robust choice.

What conductor cross-section do the terminals take?

On the direct connection, 1.5 to 35 mm². The tightening torque is 2 Nm, 3 Nm maximum. Too little torque leads to contact resistance and heating at the terminal.

At what current does the meter start counting?

The starting current of the direct connection variant is 20 mA. From this current the meter starts counting; it does not record smaller currents.

What voltage and frequency does the meter need?

400 V AC between the line conductors with a tolerance of plus/minus 20 percent, corresponding to 230 V against neutral. Nominal frequency 50 hertz, 60 hertz on request. The measuring range runs from 40 to 65 hertz.

When do I move from direct connection to transformer connection?

As soon as the expected continuous current exceeds 100 A, or the supply line has a cross-section above 35 mm². Cramped space in the distribution board also argues for transformers, because then only thin measuring leads run to the meter.

Transformer connection

What is a transformer connection?

With a transformer connection, current transformers map the primary current at a defined transformer ratio onto a small secondary current of 5 or 1 A. Only that secondary current runs through the meter. This allows installations up into the kiloampere range to be measured.

Which transformer ratios can the EMU Professional II handle?

On the 5 A secondary variant, from 5/5 to 20,000/5 in steps of 5 A. On the 1 A secondary variant, from 1/1 to 4,000/1. The ratio is set in the meter, which then scales the values to the primary side.

How high may the secondary current be?

The 3/5 variant tolerates up to 6 A of secondary current continuously. The starting current is 1 mA, so the meter also records very small loads relative to the transformer size.

What terminal data apply to the transformer-operated meter?

1 to 6 mm² conductor cross-section, tightening torque 0.8 Nm, 1 Nm maximum. The current transformer circuits must never be open during operation, because dangerously high voltages arise otherwise.

Do I have to set the transformer ratio in the meter?

Yes. Without the ratio correctly set, the meter scales the secondary values up incorrectly and the billing is wrong. The setting is described in the EMU Professional II quickstart and manual. The transformer ratio can be set several times and sealed. It should be recorded at commissioning.

Are current transformers subject to verification?

Under Article 13 paragraph 1 EMmV the validity of verification of inductive and capacitive instrument transformers is unlimited. For other transformer types the Federal Office may set a re-verification period case by case at type approval.

How accurate is measurement with transformers?

Overall accuracy results from meter and transformer together. The meter meets class B to EN 50470-3. For that to hold in practice, the transformer class has to match and the burden has to stay within the transformer’s specification.

Installation, housing and environment

How much space does the meter need in the distribution board?

90 by 91 by 72 millimetres, which is 5 modules on the 35 mm DIN rail. The weight is around 350 grams.

What degree of protection does the EMU Professional II have?

The housing meets IP51, the terminals IP20. The meter is built to protection class II. For outdoor use or damp surroundings an appropriate enclosure is needed.

In what temperature range does the meter work?

All versions operate from −25 to +70 °C. The mechanical environment class is M2, the electromagnetic one E2.

How many tariffs can the meter switch between?

Up to four. The tariffs are switched through control inputs with 230 V AC. Whether the meter works with two or four tariffs can be set on the meter. Consumption and delivery are counted separately, so feed-in tariffs can be covered as well.

Load profile and data storage

What is a load profile memory and what do I need it for?

The load profile memory records consumption at fixed intervals, on the EMU Professional II every 15 minutes by default. On certain versions the interval can be changed on the meter. From that, load peaks, standby consumption and operating times can be identified. For demand tariffs and for energy management to ISO 50001 this is the data basis.

How long does the memory last?

Around 105,000 data logger entries, each with 8 energy values and 21 instantaneous values. At a 15-minute interval that corresponds to about three years of history. The meter records regardless of whether a control system is connected.

What happens in a power failure?

The internal clock keeps running on its buffer for 18 days. The measured values are held in EEPROM and remain there for at least ten years. When power returns, the meter automatically resumes counting.

Why is the load profile important for third-party quantity allocation?

Because only time-resolved values show which quantity was passed on to third parties at which point in time. The load profile versions of the EMU Professional II are certified to PTB-A 50.7 for this.

Interfaces

Which interfaces are available?

Depending on version, M-Bus, Modbus RTU over RS-485, TCP/IP or LoRa. In addition there is an S0 pulse output. Each version has its own interface manual.

What bus load does the meter create on the M-Bus?

One M-Bus unit load, that is 1.5 mA.

What are the M-Bus factory settings?

Factory settings: primary address 000, 2400 baud and the eight-digit serial number as the secondary address. The primary address can be set from 0 to 250.

Which baud rates does the M-Bus version support?

300, 2400 or 9600 baud. The factory setting is 2400 baud. In larger installations 2400 baud has proven itself, because the possible cable length falls off considerably at higher baud rates.

What settings apply to Modbus RTU?

The meter takes one eighth of a unit load on the RS-485 segment and works at 9600 to 115,200 baud. The register assignment is in the Modbus interface manual (1485, PDF, German).

What can the TCP/IP version do?

It has an RJ45 port with 100 Mbit/s full duplex and comes with a web server, Modbus TCP, an HTTP GET interface and NTP time synchronisation. By default it obtains its IP address via DHCP. MQTT allows direct connection to dashboards and cloud services.

Which frequency band and which LoRa class does the meter use?

863 to 870 MHz, LoRaWAN 1.0.3, class C by default, class A is possible. Joining is by OTAA or ABP.

Is there a LoRa decoder?

Yes. In The Things Network the EMU Professional II LoRa is available as a template. For other systems EMU provides the decoder on GitHub, together with a payload generator and a payload decoder as web tools.

What data does the S0 pulse output deliver?

The output conforms to EN 62053-31 and is built as an opto-MOSFET for 5 to 60 V DC or AC. 1, 10, 100, 1000 or 10,000 pulses per kilowatt hour and pulse lengths of 2, 10, 30, 40 or 120 ms can be set.

Is there an optical interface?

Yes, an infrared interface to D0 in accordance with EN 62056-21. It is not intended for reading by customers. For that, use M-Bus, Modbus RTU, TCP/IP or LoRa depending on the version.

How do the EMU Professional II and the EMU M-Center work together?

The EMU M-Center reads the meter over M-Bus, Modbus RTU or Modbus TCP, stores the values and passes them on through MQTT, BACnet IP, Modbus TCP, FTP or email. The values can also be queried via HTTP. The M-Center can read the load profile memory in the meter only on the EMU Professional II.

Tenant electricity, ZEV and LEG

Which meters do I need for tenant electricity?

The distribution grid operator measures at the building’s connection point. Allocation to the individual tenants runs through sub-meters that the owner procures and operates. These meters have to meet the requirements of measuring instrument law, because their values are used for billing.

What is a self-consumption association (ZEV)?

Several end consumers at the same location join together and appear to the grid operator as a single end consumer. The legal basis is Articles 17 and 18 of the Energy Act, in the version in force since 1 January 2025. Under Article 17 paragraph 2 EnG, tenants and lessees can be included.

What is a virtual ZEV (vZEV)?

In a virtual association the distribution grid operator’s measurements remain in place and are combined arithmetically, instead of running physically through a shared connection point. The term comes from grid operator practice; the Energy Act itself does not use it. Which variant is possible is determined by the responsible distribution grid operator.

What is a local electricity community (LEG)?

An LEG under Article 17d of the Electricity Supply Act, in force since 1 January 2026, connects end consumers, producers of renewable electricity and storage operators within the same grid area, on the same grid level and physically close to each other. Its extent covers at most the territory of one municipality.

What metering does an LEG require?

Under Article 17d StromVG every participant must have a smart metering system, provided by the distribution grid operator. Billing towards the grid is based on these metering systems, not on private sub-meters.

What role does the EMU Professional II play in a ZEV or an LEG?

It measures behind the connection point: individual flats and commercial units, charging points, heat pumps, photovoltaics and storage. These values are the basis for internal billing, for checking the allocation keys and for monitoring. Metering towards the grid remains the responsibility of the distribution grid operator.

Which version suits measuring a photovoltaic installation?

A version with bidirectional measurement and load profile memory. That makes production, self-consumption and feed-in separately traceable, and up to four tariffs can be spread across consumption and delivery.

Do the verification periods also apply to sub-meters in a ZEV?

Yes. The ten-year re-verification period under Article 6 EMmV attaches to the measuring instrument, not to who operates it. If its values are used for billing, the meter has to hold valid verification.

Legal information from the Energy Act (EnG, SR 730.0) Art. 17 and 18, Electricity Supply Act (StromVG, SR 734.7) Art. 17d and 17e and the FDJP Ordinance on Measuring Instruments for Electrical Energy and Power (EMmV, SR 941.251) Art. 6 and 13. As at October 2026. The legal text in force at the time is definitive; this information does not replace legal advice.

Which version do you need?


Tell us where the data needs to go – control system, billing, cloud or all three. The interface follows from that.

Phone
+41 (0)41 545 03 00

Technical support
helpdesk [at] emuag.ch
Support form →

Orders Switzerland
orders [at] emuag.ch