Calculating M-Bus bus load: how many meters fit on one master?

Every datasheet states a maximum number of devices. In practice, an M-Bus segment rarely fails because of that number. It fails because of the supply current, the cable capacitance or a reserve nobody planned for. You can work through all three in ten minutes – before ordering, not after installation.

Key points

  • The limit is the supply current, not the device count on the datasheet.
  • One unit load corresponds to roughly 1.5 mA of quiescent current.
  • The EMU M-Center supplies 450 mA continuous load at 230 V AC and 1.6 A at 24 V DC.
  • Plan about 20 % reserve, otherwise every extension turns into a rebuild.

What a unit load really is

M-Bus meters draw current from the bus all the time, even when nobody is reading them. This quiescent current is called the unit load and amounts to roughly 1.5 mA. It is the basic unit of every bus design.

The catch: not every device draws exactly one unit load. Some meters, especially those with a display, a radio module or several measuring channels, draw two or more. If you assume one unit load per device in a mixed installation, your result will be too low every time. The value is in each meter’s datasheet – for exactly this reason.

What the master can supply

The second figure is the master’s supply current, and that depends on how the master itself is powered. With the EMU M-Center the difference is considerable:

230 V AC supply450 mA continuous, 600 mA peak
24 V DC supply1,6 A

In practice this means the often-quoted 250 M-Bus devices assume a 24 V DC supply. If you run the logger on 230 V AC and plan for 250 meters, you have a problem that only shows up in operation – usually when the last devices start dropping out now and then.

The calculation in three lines

An example from a residential development with 120 metering points for electricity, water and heat:

120 devices × 1.5 mA180 mA
8 devices with double load+ 12 mA
Reserve 20 %+ 38 mA
Total requirementabout 230 mA
Master on 230 V AC450 mA – fits with room to spare

The reserve is not a luxury. It covers inrush currents at switch-on, compensates for ageing and – most often – lets you add twenty more meters in three years without rebuilding the segment.

The cable is the second limit

Even when the current is sufficient, the cable can set the limit. Up to 5000 m at 100 nF/km and a maximum loop resistance of 90 Ω is permitted. Capacitance rounds off the signal edges; the more cable on the bus, the lower the baud rate has to be.

The recommended cable is J-Y(ST)Y 2×2×0.8 mm, shielded where possible. Star, tree and line topologies are all permitted and can be mixed – unlike RS-485, where star wiring is the most common cause of faults.

A useful side effect of 2400 Bd, which has become the de facto standard: it is the compromise at which both reach and reading time stay acceptable. For 15-minute values it is more than enough, even with 250 devices.

What to clarify before ordering

  • How many devices, and how many of them draw more than one unit load?
  • Is the master supplied with 230 V AC or 24 V DC?
  • How long is the longest segment, and what cable is already installed?
  • How many meters will be added over the next five years?
  • Which reading interval is really needed – 15 minutes, hourly, daily?

The last question is the one most often overestimated. For billing and load profile analysis, 15-minute values are enough; polling every device every minute brings no new insight but costs bus time.

Frequently asked questions


How many M-Bus meters can the EMU M-Center supply?

Up to 250 unit loads, but the supply current decides: at 230 V AC the master delivers 450 mA continuous and 600 mA peak, at 24 V DC up to 1.6 A. A standard slave draws about 1.5 mA, some devices twice as much.

How much reserve should I plan for?

About 20 percent. It covers inrush currents, ageing and later extensions. Without a reserve, every retrofit means rebuilding the segment.

What cable length is possible with M-Bus?

Up to 5000 m at 100 nF/km and a maximum loop resistance of 90 Ω. The recommended cable is J-Y(ST)Y 2×2×0.8 mm, shielded where possible. Star, tree and line topologies are permitted and can be mixed.

Read more


SEITEM-Bus interfaceInterface SEITEEMU M-CenterProduct TXTIntegrating third-party meters: untangling a mixed meter landscapeBlog post

Questions about your project?


Send us your meter list and the target system. We will tell you what works together – and what does not.

Phone
+41 (0)41 545 03 00

Technical support
helpdesk [at] emuag.ch
Support form →