Hardly any existing building has a tidy meter landscape. There is the water meter from 2009 with M-Bus, the charging infrastructure with Modbus TCP, the heat pump with S0 pulses and a building automation system that expects BACnet. Each part is manageable on its own. The problem only arises when they have to work together.

Key points

  • The protocol is rarely the problem – the missing inventory is.
  • One central collection point replaces four parallel reading paths.
  • Device drivers save you typing in register addresses.
  • Without monitoring, a dead metering point is only noticed at the annual billing.

First the inventory, then the technology

The first step is not a technical one. Before any gateway is ordered, you need a list: which meter is where, from which manufacturer, with which protocol, which address and which medium. In many properties this list does not exist – and that is the real reason projects drag on.

Experience shows that such a survey turns up at least one meter that has not been read for years and at least one whose values flow into two systems that contradict each other.

Reading list and Modbus register mapping in the EMU M-Center web interface
Every value can be assigned individually. On the left, the meter’s readings with register number; on the right, unit, divisor, OBIS code and the complete Modbus mapping with start address, function code and data type. Open full view: Reading list and Modbus register mapping in the EMU M-Center web interface

One collection point instead of four reading paths

The classic wrong turn is to connect each protocol separately: an M-Bus level converter here, a Modbus gateway there, a pulse counter in between. It works, but it creates four places where something can fail and four configurations someone has to maintain.

The EMU M-Center brings this together: M-Bus up to 250 devices via the built-in level converter, Modbus RTU up to 64 devices via two RS-485 interfaces, Modbus TCP over Ethernet and up to 8 S0 pulse inputs via the Flex I/O. One device, one interface, one place to look.

Device drivers instead of register tables

With Modbus, the real work is not the wiring but the register table: which value sits at which address, as a 16- or 32-bit number, in which byte order. Doing this by hand for twelve device types produces a configuration nobody can follow any more.

Stored device drivers in Device Management take care of this. Instead of typing addresses, you select the device type – and the readings arrive with names. For M-Bus there is also an automatic search by primary and secondary address; manual additions remain possible.

Read once, use many times

The biggest practical gain is reuse. A building automation system polling a Modbus segment effectively occupies it alone. A central logger reads once and serves several target systems from that at the same time:

  • Building automation via BACnet IP or OPC UA
  • Cloud and dashboards via MQTT
  • Billing via CSV, Excel or JSON by (s)FTP and e-mail
  • Analysis and utility cost billing in Joulio-Web

A new target system then means a configuration, not a second set of wiring.

Where most projects tip over

Not during setup, but in operation. A metering point fails, nobody notices, and eleven months later the values for billing are missing. This cannot be repaired after the fact – the values are estimated, and that is where the discussion with the tenants begins.

That is why monitoring belongs in the design from the start: detect and log failed readings, keep an eye on status messages and communication faults, report outliers. With twelve meters you still notice a failure yourself. With 120 you no longer do.

Frequently asked questions


Can I combine meters from other manufacturers with EMU devices?

Yes. The EMU M-Center reads meters from any manufacturer via M-Bus, Modbus RTU and Modbus TCP and takes S0 pulses via the Flex I/O. For M-Bus, the meter search by primary and secondary address runs automatically.

Where do I start with an installation that has grown over time?

With the inventory: which meter is where, from which manufacturer, with which protocol and which address. Only then can you decide which interfaces the collection point really needs.

How do I prevent a metering point from failing unnoticed?

With cyclic reading and logging. Failed readings, status messages, communication faults and outliers must be monitored and reported – missing values cannot be reconstructed afterwards.

Read more


SEITEEMU M-CenterProduct TXTCalculating M-Bus bus load: how many meters fit on one masterBlog post TXTFrom M-Bus to BACnet IP: meter data in building automationBlog post

Questions about your project?


Send us your meter list and the target system. We will tell you what works together – and what does not.

Phone
+41 (0)41 545 03 00

Technical support
helpdesk [at] emuag.ch
Support form →