What a unit load really is
M-Bus meters draw current from the bus all the time, even when nobody is reading them. This quiescent current is called the unit load and amounts to roughly 1.5 mA. It is the basic unit of every bus design.
The catch: not every device draws exactly one unit load. Some meters, especially those with a display, a radio module or several measuring channels, draw two or more. If you assume one unit load per device in a mixed installation, your result will be too low every time. The value is in each meter’s datasheet – for exactly this reason.
What the master can supply
The second figure is the master’s supply current, and that depends on how the master itself is powered. With the EMU M-Center the difference is considerable:
| 230 V AC supply | 450 mA continuous, 600 mA peak |
|---|---|
| 24 V DC supply | 1,6 A |
In practice this means the often-quoted 250 M-Bus devices assume a 24 V DC supply. If you run the logger on 230 V AC and plan for 250 meters, you have a problem that only shows up in operation – usually when the last devices start dropping out now and then.
The calculation in three lines
An example from a residential development with 120 metering points for electricity, water and heat:
| 120 devices × 1.5 mA | 180 mA |
|---|---|
| 8 devices with double load | + 12 mA |
| Reserve 20 % | + 38 mA |
| Total requirement | about 230 mA |
| Master on 230 V AC | 450 mA – fits with room to spare |
The reserve is not a luxury. It covers inrush currents at switch-on, compensates for ageing and – most often – lets you add twenty more meters in three years without rebuilding the segment.
The cable is the second limit
Even when the current is sufficient, the cable can set the limit. Up to 5000 m at 100 nF/km and a maximum loop resistance of 90 Ω is permitted. Capacitance rounds off the signal edges; the more cable on the bus, the lower the baud rate has to be.
The recommended cable is J-Y(ST)Y 2×2×0.8 mm, shielded where possible. Star, tree and line topologies are all permitted and can be mixed – unlike RS-485, where star wiring is the most common cause of faults.
A useful side effect of 2400 Bd, which has become the de facto standard: it is the compromise at which both reach and reading time stay acceptable. For 15-minute values it is more than enough, even with 250 devices.
What to clarify before ordering
- How many devices, and how many of them draw more than one unit load?
- Is the master supplied with 230 V AC or 24 V DC?
- How long is the longest segment, and what cable is already installed?
- How many meters will be added over the next five years?
- Which reading interval is really needed – 15 minutes, hourly, daily?
The last question is the one most often overestimated. For billing and load profile analysis, 15-minute values are enough; polling every device every minute brings no new insight but costs bus time.