Two wires, polarity-independent, up to 250 meters and 5000 m of cable. M-Bus is unspectacular and for exactly that reason the standard for remote meter reading inside buildings. This page explains how it works, how to size it and what the EMU M-Center takes care of.

The principle

How does M-Bus work?


M-Bus – short for Meter-Bus – is the European standard for remote reading of consumption meters, defined in EN 13757-2 for the physical layer and EN 13757-3 for the application layer. It was designed for exactly the case that is normal in a building: many meters, long distances, small amounts of data, no real-time requirement.

The topology is deliberately undemanding. A master feeds an unscreened two-wire line with around 40 volts. All meters hang off it in parallel – there is no stub length restriction as with RS-485, and no polarity: anyone who swaps the two wires will not notice, because it makes no difference. That is precisely what makes the bus robust on site.

Communication is asymmetric. The master transmits by briefly lowering the bus voltage. The meter answers by increasing its current draw – from its quiescent load to a multiple of it. A meter’s quiescent load is called a unit load and amounts to around 1.5 mA. The entire sizing of the bus follows from it.

Terms

Unit load

Quiescent current draw of a meter, around 1.5 mA. One device can draw several unit loads.

Primary address

Short address from 1 to 250, set on the meter. Fast, but awkward if assigned twice.

Secondary address

Eight-digit identification number of the device, combined with manufacturer, version and medium. Unique from the factory.

Baud rate

300, 2400 or 9600 Bd. In practice 2400 Bd, because that gives the best range at a usable speed.

Telegram

A request-and-answer sequence. The master asks, the meter delivers its complete data record.

Step by step

How does an M-Bus master read its meters?


Using an EMU M-Center with an EMU Professional II and the Helvatron H2O and DELTA III meters as an example: from powering the bus and selecting meters by secondary address to passing on the readings.

MQTT · BACnet IP · Modbus TCP · CSVEMU M-CenterM-Bus masterabout 40 V on two wires · polarity irrelevantSelection by secondary addressRequest dataMeter raises its current drawProfessional IIEMU · electricityHelvatron H2OWaterHelvatron DELTA IIIHeatID 202400011.5 mAID 202400021.5 mAID 202400031.5 mAExample IDs · real secondary addresses are assigned at the factoryTotal 4.5 mA2400 Bd3.1.2.
  1. Two wires for all metersThe M-Center powers the two-wire line with about 40 V. All meters are connected in parallel, and polarity does not matter.
  2. Unit loadEach meter permanently draws about 1.5 mA. The master must be able to supply the total.
  3. Selecting a meterThe M-Center selects the meter by its secondary address, a unique ID assigned at the factory. To do so, it lowers the bus voltage bit by bit.
  4. Requesting dataThe M-Center then requests the readings from the selected meter.
  5. The meter respondsOnly the selected meter responds, by briefly raising its current draw. The M-Center measures this current.
  6. Polling in turnThe M-Center reads one meter after another. At 2400 baud a telegram takes well under a second.
  7. Passing on the dataThe M-Center reads once and passes the values on simultaneously via MQTT, BACnet IP, Modbus TCP or CSV.

Sizing

How many meters fit on one M-Bus?


The figure of 250 appears on every data sheet, but it is rarely the real limit. Three things set the limit, in this order:

1. Supply current

Every meter permanently draws its unit load. The total must stay below what the master can deliver – and that depends on how the master itself is powered. On the EMU M-Center this is 450 mA continuous and 600 mA peak at 230 V AC, but 1.6 A at 24 V DC. Anyone planning 250 unit loads needs to calculate with 24 V DC, not 230 V AC.

2. Cable capacitance

The bus tolerates up to 5000 m at 100 nF/km and a maximum loop resistance of 90 Ω. The capacitance smears the signal edges; the more cable, the lower the baud rate has to be. The recommended cable is J-Y(ST)Y 2×2×0.8 mm, screened where possible.

3. Read cycle

At 2400 Bd a telegram takes well under a second, depending on the data record. With 250 devices that still adds up. For quarter-hour values this is uncritical; for polling every device every minute it is not.

Worked example

120 meters × 1.5 mA180 mA
Reserve for inrush currentsapprox. 20 %
Requirementaround 215 mA
Master at 230 V AC450 mA continuous – fits
Master at 24 V DC1600 mA – ample

Devices with more than one unit load and long stub lines increase the requirement. When in doubt we work it out with you.

Topology

Star, tree and line are all permitted and may be mixed. The bus is monitored against short circuit and overcurrent and is galvanically isolated – an accidental short while connecting does not bring the installation down.

Use case

How do the Professional II and the M-Center work together?


An M-Bus meter on its own is of little use – it needs a master to power it, poll it and pass the values on. That is the role of the EMU M-Center. It has a built-in level converter, so no separate power supply unit is needed.

The practical gain is in commissioning. The M-Center searches for meters automatically by primary and secondary address; adding them manually is possible but rarely necessary. Plug-and-play drivers make sure the data records arrive with sensible names instead of as numbered raw values. Everything is operated in a web browser, with no local PC software.

After that the M-Bus becomes invisible. The M-Center reads cyclically, stores the values in its 16 GB and passes them on to whatever you actually use: MQTT for cloud and dashboards, BACnet IP or OPC UA for the building management system, Modbus TCP for the control system, CSV, JSON or Excel over (s)FTP and email for billing – and Joulio-Web for analysis and utility cost statements.

Failed readings are detected and logged; error flags, communication faults and outliers go into monitoring around the clock. With 120 meters, nobody would otherwise notice that one has been silent for three weeks.

A typical chain

Field

Professional II M-Bus, plus water and heat meters from other manufacturers on the same bus

Collect

EMU M-Center as master, up to 250 devices, cyclic reading

Forward

MQTT, BACnet IP, OPC UA, Modbus TCP, (s)FTP, email

Analyse

Joulio-Web: load profile, reports, utility cost statements

Where it fits

When is M-Bus the right interface?


In favour

  • Many meters from different manufacturers and for different media on the same bus
  • Long distances inside the building, up to 5000 m
  • Polarity-independent – forgiving during installation
  • Electricity, water and heat in one system
  • No IT infrastructure needed in the riser

Against

  • Per-second values or control tasks
  • Very large amounts of data per device
  • Installations where Ethernet is everywhere anyway – then TCP/IP is more direct
  • Single, distant measuring points with no cable route – that is what LoRa is for

View TCP/IP · View LoRa

Documents

Manuals and data sheets to download


This page explains the principle. Register lists, telegram structure, terminal assignment and the exact parameters of each version are in the interface manual.

PDFM-Bus interface manual1480 · Professional II · English PDFProfessional II data sheet1441 · English PDFM-Center manual2151 · master side · English PDFM-Center data sheet2141 · bus load and limits

Frequently asked questions

Frequently asked questions about the interface


How many Professional II meters can I put on one M-Bus?

The limit is not the number of devices but the supply current. Each meter draws around 1.5 mA, one unit load. On the EMU M-Center, 450 mA continuous and 600 mA peak are available at 230 V AC, and 1.6 A at 24 V DC. The figure of 250 devices is therefore a 24 V DC calculation.

Does the polarity of the two wires matter?

No. M-Bus is polarity-independent. Swapped wires work just the same – one of the reasons the bus has proven itself on site.

Which cable should I install?

J-Y(ST)Y 2×2×0.8 mm is recommended, screened where possible. The limit is 5000 m at 100 nF/km and a maximum loop resistance of 90 Ω. Star, tree and line topologies are permitted and may be mixed.

Primary or secondary addressing?

Secondary addressing is the safe choice in mixed installations, because the eight-digit identification number is unique from the factory. Primary addresses from 1 to 250 are faster, but they have to be set on the device and documented; otherwise duplicates only show up in operation. The M-Center searches for both automatically.

Which baud rate should I set?

In practice 2400 Bd. The options are 300, 2400 and 9600 Bd; 2400 Bd is the usual compromise between range and speed. For quarter-hour values that is ample, even in large installations.

Do I really need an M-Center?

You need an M-Bus master in any case, because the bus has to be powered and polled. The M-Center has the level converter built in and also handles meter discovery, storage and forwarding to your target systems.

Not sure whether M-Bus is the right fit?


Send us the number of measuring points, the distances and the target system. We will tell you which version makes sense – and when another interface would be the better choice.

Phone
+41 (0)41 545 03 00

Technical support
helpdesk@emuag.ch

Orders Switzerland