Products/EMU Professional II/KNX

Interface · EMU Professional II · available from Q1 2027

KNX on the EMU Professional II: power meter for building automation

The EMU Professional II is getting a KNX interface. It lets you bring the energy values of the three-phase power meter straight into a KNX installation. The version will be available from Q1 2027; technical data and ETS product data will follow with the release.

EMU Professional II 3/100, front view with display
Picture: EMU Professional II without interface. A picture of the KNX version will follow.

Available from Q1 2027

What does the KNX version offer?


In many commercial and residential buildings, KNX is the bus on which lighting, blinds and heating already work together. The KNX version puts the power meter on the same bus.

The meter as a KNX device

The meter becomes part of the KNX installation and makes its measured values available there, without an additional gateway.

The same metering technology

The KNX version is based on the EMU Professional II: three-phase measurement, as direct connection up to 100 A or as transformer connection.

From Switzerland

As with all EMU meters, development, PCB assembly and final assembly take place in Switzerland.

Versions

Which KNX versions are planned?


VersionArticle numberStatus
3/100 – direct connection up to 100 AP20A000Kavailable from Q1 2027
3/5 – transformer connectionP21A000Kavailable from Q1 2027

We will publish technical data, the data sheet and ETS product data on this page as soon as the version is released. The versions available today are in the list of order numbers.

Background

What is KNX and when does it fit?


KNX is a manufacturer-independent standard for home and building automation (EN 50090, ISO/IEC 14543-3). Devices from different manufacturers share one bus and are configured with the ETS software. Measured values reach displays, visualisations or an energy management system through group addresses.

KNX fits when the building already has a KNX installation and the energy values are needed there. If you want to collect meters from different manufacturers centrally and pass the data on to control systems, billing or the cloud, use M-Bus or Modbus RTU together with the EMU M-Center.

Frequently asked questions

Frequently asked questions about the KNX version


When will the EMU Professional II with KNX be available?

The KNX version will be available from Q1 2027. We will give you the exact delivery date for your order on request.

What are the article numbers of the KNX version?

P20A000K for direct connection up to 100 A (3/100) and P21A000K for transformer connection (3/5).

Is there a data sheet or ETS product data yet?

Not yet. We will publish both on this page as soon as the version is released.

Interested in the KNX version?


Get in touch with your project. We will let you know as soon as the meter can be ordered.

Phone
+41 (0)41 545 03 00

Technical support
helpdesk@emuag.ch

Orders Switzerland
orders@emuag.ch